Your Ad Here!

Bakehouse Studio



Where the heart of your music speaks!

Next, the hallway ceiling and walls over the doorways are plastered. The plastering is taken only to a point that will not be visible.

The wiring that the electricians installed for the hall lighting has been plastered in place.

The beading for the plastering around the window in the gable-end wall has been put in place, and the double-glazed unit that was in the control room area has been brought out ready for fitting into the studio framework.

The rockwool has been positioned in the cavities of the framework all the way around.

<<< Back | Next >>>

Subscribe to the Bakehouse Newsletter!






Latest Releases from Wobbly Music
New Release Featured Release